windfarm layout

The wind farm consists of 54 wind turbines, Within the concession area, two sub-areas are separated by a channel defined around the Interconnector gas conduct and the Concerto South 1 telecommunication cable:

  • Sub area A (southwestern part of the concession) consists of 30 turbines
  • Sub area B (northeastern part of the concession) consists  of 24 turbines

This project was built in 3 phases

Infield electrical cables to the transformer station connect the wind turbines in strings, and each string to the transformer station situated in the south-eastern corner of sub area A.

The transformer station transforms the capacity from 33.000 volt to 150.000 volt. Two 150 kV high-voltage cables link the wind farm area to the high voltage grid of Elia onshore in Bredene.

Specifications

Water depth  12 to 27,5 m