EXECUTION PHASE I
WEEK 19
1. OCS HVM: |
Preparation workyard Onshore
Construction Site "Halve Maan" |
2. HDD: |
Horizontal Directional Drilling for the landfall
of the 150kV seacable |
3. GBF: |
Gravity Base Foundation |
4. CON: |
Cables Onshore |
5. COF: |
Cables Ofshore |
6. MAC: |
Marine Activities |
Submerged on Throntonbank
D1 |
 |
Submerged on Thorntonbank
D2 |
|
 |
Installation of auxillaries
D3 |
Construction
of the platform D5 |
Connection
to the Elia grid |
Construction
of the landfall cofferdam for the pull in of the sea cable |
 |
Construction
of the turntable on the cable lay barge Eide 28 |
 |
Preparation
of the gravel bed for the GBF D4-5-6 |
Backfill
of the foundation pit of D1 |
Infill
of D2 |
|
|