Menu

Cables between turbines

33 kV cable network, with a total distance of 50,75 km, is laid between the wind turbines. This network will collect the energy generated by the wind turbines and transports it to the Offshore Transformer Station. All turbines can be switched on or off individually from this collecting network.

Cables between turbines