Construction
Construction of the gravity base foundation
![]() |
Dimensions |
|
Height Weight External Ø base slab Conical part Cylindrical part Concrete |
± 42 m ± 2.700 to 3.000 t 23,5 m 17m to 6,5 m 9,1 m ± 6.800 m3 |
Preperation of the seabed level
![]() |
DREDGING OF THE LOOSE SAND LAYER (-24.0 M HEIGHT VERSUS LOW WATER SEA LEVEL) |
![]() |
DREDGING OF THE DENSE SAND LAYER (-25.5 M HEIGHT VERSUS LOW WATER SEA LEVEL) |
![]() |
INSTALLATION OF THE FOUNDATION LAYER |
![]() |
LIFTING OF THE GBF |
|
BACKFILL OF THE FOUNDATION PIT THORNTON I |
|
INFILL OF THE GBF |
|
SCOUR PROTECTION |
Construction of the wind turbine
![]() |
Capacity Rotor diameter Hub height offshore |
5 MW 126 m 94 m height versus low water sea level |