Owners Engineer
Responsible for the basic design and supervision of the detailed design.
|


|
THV Seawind
Marine and Electrical Contractor responsible for the design, construction and installation of the foundations as well as for the installation of the transformer station, the cables and the turbines
|
 |
ABB
Responsible for the design and supply of the complete electrical infrastructure including: Offshore Transformer Station, the array and export cables, onshore grid connection, protection and control system.
|

|
Senvion
Responsible for the design, supply and installation, of the wind turbines.
|
 |
Owec Tower A/S
Responsible for the detailed design of the jacket foundations for the turbines
|
 |
Reinertsen
Responsible for the detailed design of the jacket foundation for the offshore transformer station
|
 |
HSM – Schiedam
Responsible for the detailed design and construction of the topside structure for the offshore transformer station as subcontractor of ABB
|
 |
Smulders Foundations B.V.
EPC Subcontractor Foundations
|
 |
Mwaves
Marine Warranty Surveyor
|
 |
Mott McDonald
Lenders Engineer
|
 |
Det Norske Veritas (DNV)
Certification of the offshore transformer station
|
 |
DEWI-OCC
Certification of the project
|