1. OCS HVM: Preparation workyard Onshore Construction Site "Halve Maan"
2. HDD: Horizontal Directional Drilling for the landfall of the 150kV seacable
3. GBF: Gravity Base Foundation

1. OCS HVM

Casting concrete of workplatform D3

2. HDD

3. GBF

Casting concrete foundation slab D1