Construction and engineering partners

 

IMDC

Tractebel Engineering

Owners Engineer

Responsible for the basic design and supervision of the detailed design.

Dredging International

cofely

THV Seawind

Marine and Electrical Contractor responsible for the design, construction and installation of the foundations

ABB

ABB

Responsible for the design and supply of the complete electrical infrastructure including: Offshore Transformer Station, the array and export cables, onshore grid connection,  protection and control system and a long term maintenance agreement

lgo Senvion256x69px

Senvion

Responsible for the design, supply and installation, management and maintenance of the wind turbines during the first 10 years of exploitation

OWEC TOWER

Owec Tower A/S

Responsible for the detailed design of the jacket foundations for the turbines

Reinertsen

Reinertsen

Responsible for the detailed design of the jacket foundation for the offshore transformer statio

HSM

HSM – Schiedam

Responsible for the detailed design of the topside structure for the offshore transformer station

smulders groep

Smulders Foundations B.V.

EPC Subcontractor Foundations

Mwaves

Mwaves

Marine Warranty Surveyor

Mott McDonald

Mott McDonald

Lenders Engineer

DNV

Det Norske Veritas (DNV)

Certification of the offshore transformer station

DEWI

DEWI-OCC

Certification of the project